Monday, September 25, 2017

Hit Hard

I don't think I have ever had such a hard time getting over a holiday, came home with a horrible cough, leg weakness and just feeling so tired and out of sorts. 
A new week has dawned, with the builders coming at 8am this morning for approx 4 weeks (their prediction just in case) to give us a brand new bathroom.
I feel better, need to catch up on reading all your posts, so that is what I will be doing behind closed doors this morning.
 Comment made "why are you cleaning the bathroom when it is going to be gutted?"
New shower, basins, taps etc towel rails, floor and wall tiles......

7 comments:

  1. Hope the renovation goes faster than planned!

    ReplyDelete
  2. Will your new bathroom have Moroccan mosaic tiles?
    Get better soon! Take good rests between blog reading!

    ReplyDelete
  3. Four weeks sounds about right. Get the dust sheets out, it goes everywhere.
    A good excuse to hide out at the library reading an absorbing book or two.

    ReplyDelete
  4. it will be all worth it to have your new bathroom ,i am glad you are feeling better xx

    ReplyDelete
  5. Nothing like an up-coming renovation to shake up the body and the brain. Hope you can sit back and enjoy more than counting the days until it is done.

    ReplyDelete
  6. Hope you are feeling better. Don't try to do TOO much! I'd slash the bathroom for sure!

    ReplyDelete